Project Description
Faraday School – Foundation Repair
Education
About the Project
For this project, we structurally reinforced the existing school floor system underneath the school within the existing crawlspace. The job involved new floor sheathing, flooring, and drywall touch-ups to the south-most classroom after foundation repairs were completed. We also tunnelled underneath the existing school to install new piles, pile caps, and concrete piers, re-shape the existing crawlspace, install a new crawlspace drainage system and remove the existing crumbling foundation.
Project Details
CLIENT
Winnipeg School Division No. 1
role
Construction Management
project schedule
2 Months
BUDGet
$1.5 Million